Difference between revisions of "NPS Condition Assessments"

From Biogeog
Jump to navigationJump to search
 
(195 intermediate revisions by 2 users not shown)
Line 1: Line 1:
=Pinnacles=
+
=John Muir=
==Status==
+
==Status 10/28/11==
 
{| class="wikitable", border="1" cellpadding="2"
 
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
|-
 
! Stressor/Indicator
 
! Stressor/Indicator
! Who
+
! Due/Done
 
! Conceptual Model
 
! Conceptual Model
 
! Data Compiled
 
! Data Compiled
 
! Analysis Done
 
! Analysis Done
! Report Section
+
! Report Status
 +
! Graphic status
 
! Feedback from NPS
 
! Feedback from NPS
 
|-
 
|-
! Fire regime
+
! STRESSORS
| Frank
+
|-
| No
+
! Housing density
 +
! Done
 +
| Done
 +
| Done
 +
| Done
 +
! 2nd draft in report 10/28/11
 +
! Done
 +
| reviewed by lisa sanders 10/21/11
 +
|-
 +
! Human footprint
 +
! Done
 +
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| Draft
+
! 2nd draft in report 10/12/11
| PJ9--wants analysis from 1500 but willing to have us summarize lit evidence
+
! Done
 +
| reviewed by Fernando 10/07/11
 +
|-
 +
! AIR AND CLIMATE
 +
|-
 +
! Air quality
 +
! Done
 +
| done
 +
| done
 +
| done
 +
! 2nd draft in report 10/14/11
 +
! Done
 +
| reviewed by Fernando 10/11/11
 
|-
 
|-
|-valign="top"
+
! Climate
! Pesticides
+
|
| Patrick
+
| NA
 +
| Done
 +
| done
 +
! 2nd draft in report 10/17/11
 +
! Done
 +
| reviewed by Fernando 10/11/11
 +
|-
 +
 
 +
! WATER
 +
|-
 +
! Hydrology and water quality
 +
! Done
 +
| done
 +
| done
 +
| done
 +
! 2nd draft in report 10/14/11
 +
! Done
 +
| reviewed by Fernando 10/31/11
 +
 
 +
|-
 +
! BIOLOGICAL INTEGRITY
 +
|-
 +
! Alameda whipsnake
 +
! Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| Draft
+
! 2nd draft in report 10/14/11
| PJ12--R. muscosa split?; PJ13--would like analysis back to 1980s or even 1940; PJ15--EPA findings flawed; PJ16--more detail on distance, drift, and aerial spraying; MK20--what are top 10 of the 45 pesticides?
+
! Done
 +
| reviewed by Fernando 10/07/11
 
|-
 
|-
! Feral pigs
+
! Invasive plants and disease (SOD)
 
| David
 
| David
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| Draft
+
! 2nd draft in report 11/07/11
| PJ23--some data on pig kill density inside and outside but no metadata
+
! Done
 +
| reviewed by Fernando 11/04/11
 
|-
 
|-
! Climate change
+
! LANDSCAPES
| Patrick
 
| No
 
| In progress
 
| To be done
 
| To be done
 
| have not seen yet
 
 
|-
 
|-
! Housing density
+
! Fire regime
| Patrick
+
! Done
| NA
+
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| Draft
+
! 2nd draft in report 11/03/11
| comments to show public land (zero density) and refer to impacts associated with housing, eg. feral cats
+
! Done
 +
| reviewed by Fernando 10/31/11
 
|-
 
|-
! Prairie falcons
+
! Future fire regime
| Frank
+
! Done
 +
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| Nearly done
+
! 2nd draft in report 10/24/11
| In progress
+
! Done
| have not seen yet
+
| reviewed by Fernando 10/20/11
 
|-
 
|-
! Cal red-legged frogs
+
|-valign="top"
| Patrick
+
! Habitat connectivity
 +
! Done
 
| Done
 
| Done
| No
 
| No
 
| No
 
| comments on draft conceptual model--revisions made 12/16/09
 
|-
 
! Air quality
 
| Patrick
 
| No
 
| In progress
 
| No
 
| No
 
| have not seen yet
 
|-
 
! Light pollution
 
| David
 
| NA
 
 
| Done
 
| Done
 
| Done
 
| Done
| Draft
+
! 2nd draft in report 10/13/11
| comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
+
! Done
 +
| reviewed by Fernando 10/07/11
 
|-
 
|-
! Vegetation
 
| Frank
 
| David to draft model
 
| No
 
| No
 
| No
 
| have not seen yet
 
|-
 
! Other endpoints?
 
 
|}
 
|}
 
<p>
 
 
<br>
 
<br>
 
+
<br>
 
=Santa Monica Mtns=
 
=Santa Monica Mtns=
==Status==
+
==Status 09/02/11==
 
{| class="wikitable", border="1" cellpadding="2"
 
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
|-
 
! Stressor/Indicator
 
! Stressor/Indicator
! Who
+
! Due/Done
 
! Conceptual Model
 
! Conceptual Model
 
! Data Compiled
 
! Data Compiled
 
! Analysis Done
 
! Analysis Done
! Report Section
+
! Report Status
 +
! Graphic status
 
! Feedback from NPS
 
! Feedback from NPS
 
|-
 
|-
! Fire-plant community interactions
+
! STRESSORS
| Frank
+
|-
| In progress
+
! Housing density
| No
+
! Done
| No
+
| NA
| No
+
| Done
| have not seen conceptual model yet
+
| Done
 +
! 2nd draft in report 07/28/11
 +
! Done
 +
| approved by denise 7/27/11
 +
|-
 +
! Road effects and accessibility
 +
! Done
 +
| NA
 +
| Done
 +
| Done
 +
! 2nd draft in report 05/02/11
 +
! Done
 +
| approved by denise, 5/2/11
 +
|-valign="top"
 +
! Pesticides
 +
! Done
 +
| NA
 +
| Done
 +
| Done
 +
! 1st draft in report 08/08/11
 +
! Done
 +
| approved by denise 08/05/11
 
|-
 
|-
 
|-valign="top"
 
|-valign="top"
! Habitat connectivity
+
! Rodenticides
| David
+
| Patrick
| Draft
+
| NA
| No
+
| Done
| No
+
| Done
| No
+
| 1st draft sent 5/19/10
| Comments only from MK as of 12/22/09
+
| 1st draft
 +
| awaiting response
 +
|-
 +
! Human footprint
 +
! Done
 +
| Done
 +
| Done
 +
| Done
 +
! 1st draft in report 08/06/11
 +
! Done
 +
| approved by denise 08/05/11
 +
|-
 +
! AIR AND CLIMATE
 +
|-
 +
! Air quality
 +
! Done
 +
| NA
 +
| Done
 +
| Done
 +
! 2nd draft in report 07/28/11
 +
! Done
 +
| approved by denise 7/27/11
 +
|-
 +
! Climate
 +
! Done
 +
| NA
 +
| Done
 +
| Done
 +
! 1st draft in report 08/07/11
 +
! Done
 +
| approved by denise 08/05/11
 +
|-
 +
! WATER
 +
|-
 +
! Water quality
 +
! Done
 +
| NA
 +
| TMDL data obtained
 +
| Done
 +
! 1st draft in report 08/07/11
 +
! Done
 +
| approved by densie 08/05/11
 +
|-
 +
! BIOLOGICAL INTEGRITY
 
|-
 
|-
 
! Invasive plants
 
! Invasive plants
| David
+
! Done
| Draft
+
| Done
| check for Bren GP database here or ask DK
+
| Done
| No
+
| Done
| No
+
! 2nd draft in report 04/27/11
| Comments from MK as of 12/22/09; DK liked conceptual model of vulnerability
+
! Done
 +
| approved
 
|-
 
|-
! Climate change
+
! LANDSCAPES
| Patrick
 
| No
 
| No
 
| No
 
| No
 
| have not seen yet
 
 
|-
 
|-
! Housing density
+
! Fire regime
| Patrick
+
| 7/30/11
| No
+
| Done
 +
| Done
 
| Done
 
| Done
| No
+
| 1st draft done 10/31/11
| No
+
| 1st draft done 10/31/11
| have not seen yet
+
| awaiting comments
 
|-
 
|-
! Air quality
+
! Future fire regime
| Patrick
+
! Done
| See Tejon GP
+
| NA
| No
+
| acquired from T. Westerling
| No
+
| Done
| No
+
! 2nd draft in report 08/01/11
| have not seen yet
+
! Done
 +
| final comments by Marti Witter and Denise on 07/28/11
 +
|-valign="top"
 +
! Habitat connectivity
 +
! Done
 +
| NA
 +
| Done-from CEHC
 +
| Yes
 +
! 2nd draft in report 06/24/11
 +
! Done
 +
| approved 7/12/11
 
|-
 
|-
 
! Light pollution
 
! Light pollution
| David
+
! Done
 
| NA
 
| NA
| No
+
| Done
| No
+
| Done
| No
+
! 2nd draft in report 05/02/11
|  
+
! Done
 +
| approved by denise, 5/2/11
 
|-
 
|-
! Other endpoints?
 
 
|}
 
|}
 +
<br>
 +
<br>
 +
 +
  
 
----
 
----
  
 
----
 
----

Latest revision as of 21:21, 7 November 2011

John Muir

Status 10/28/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density Done Done Done Done 2nd draft in report 10/28/11 Done reviewed by lisa sanders 10/21/11
Human footprint Done Done Done Done 2nd draft in report 10/12/11 Done reviewed by Fernando 10/07/11
AIR AND CLIMATE
Air quality Done done done done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/11/11
Climate NA Done done 2nd draft in report 10/17/11 Done reviewed by Fernando 10/11/11
WATER
Hydrology and water quality Done done done done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/31/11
BIOLOGICAL INTEGRITY
Alameda whipsnake Done Done Done Done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/07/11
Invasive plants and disease (SOD) David Done Done Done 2nd draft in report 11/07/11 Done reviewed by Fernando 11/04/11
LANDSCAPES
Fire regime Done Done Done Done 2nd draft in report 11/03/11 Done reviewed by Fernando 10/31/11
Future fire regime Done Done Done Done 2nd draft in report 10/24/11 Done reviewed by Fernando 10/20/11
Habitat connectivity Done Done Done Done 2nd draft in report 10/13/11 Done reviewed by Fernando 10/07/11



Santa Monica Mtns

Status 09/02/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Road effects and accessibility Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11
Pesticides Done NA Done Done 1st draft in report 08/08/11 Done approved by denise 08/05/11
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 1st draft awaiting response
Human footprint Done Done Done Done 1st draft in report 08/06/11 Done approved by denise 08/05/11
AIR AND CLIMATE
Air quality Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Climate Done NA Done Done 1st draft in report 08/07/11 Done approved by denise 08/05/11
WATER
Water quality Done NA TMDL data obtained Done 1st draft in report 08/07/11 Done approved by densie 08/05/11
BIOLOGICAL INTEGRITY
Invasive plants Done Done Done Done 2nd draft in report 04/27/11 Done approved
LANDSCAPES
Fire regime 7/30/11 Done Done Done 1st draft done 10/31/11 1st draft done 10/31/11 awaiting comments
Future fire regime Done NA acquired from T. Westerling Done 2nd draft in report 08/01/11 Done final comments by Marti Witter and Denise on 07/28/11
Habitat connectivity Done NA Done-from CEHC Yes 2nd draft in report 06/24/11 Done approved 7/12/11
Light pollution Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11