NPS Condition Assessments
From Biogeog
Jump to navigationJump to searchPinnacles
Status
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
---|---|---|---|---|---|---|
STRESSORS | ||||||
Housing density | Patrick | NA | Done | Done | Draft in report 5/10/10 | |
Road effects and accessibility | David | NA | Done | Done | 1st draft sent 7/12/10 | |
Pesticides | Patrick | NA | Done | Done | Draft in report 5/10/10, needs minor editing | |
Rodenticides | Patrick | NA | Done | Done | Draft in report 5/25/10 | |
Human footprint | David | Done | Done | Done | Draft in report 5/25/10 | |
AIR AND CLIMATE | ||||||
Air quality | Patrick | No | Done | Done | Draft in report 5/25/10 | |
Climate (change) | Frank/Patrick | NA | Data acquired from A. Flint | Done | 1st draft sent 7/12/10 | |
BIOLOGICAL INTEGRITY | ||||||
Invasive plants | David | revised 4/29/10 as per Paul | Paul sent weed zone shapefile; is getting weed presence/absence data for them | In progress | In progress | Paul J. would like SAMO-type analysis except with their weed zones and numbers of priority invasives to replace Bren GP exposure ranking |
Feral pigs | David | Done | Done | Done | 2nd draft in report 02/08/10 | |
Prairie falcons | Frank | Done | Done | Nearly done | In progress | have not seen yet |
Cal red-legged frogs | Patrick | Done | No | No | No | comments on draft conceptual model--revisions made 12/16/09 |
Vegetation | Frank | David to draft model | No | No | No | have not seen yet |
LANDSCAPES | ||||||
Fire regime | Frank | No | Done | Done | Draft in report 5/10/10, needs minor editing | PJ9--wants lit summary of evidence of historical fire back to ~1500 |
Climate change-wildfire interaction | David | NA | obtained from T. Westerling | Done | 1st draft sent 7/12/10 | |
Habitat connectivity | David | Draft | Done-from CEHC | Done | Draft in report 5/25/10; added 6/2/10--add CircuitScape modeling | Frank will do some CircuitScape analysis for badgers and SJ coachwhip |
Habitat connectivity-badgers | Frank | Draft | Done | Done-Circuitscape | 1st draft sent 7/12/10 | |
Dark night sky | David | NA | Done | Done | 2nd draft in report 02/08/10 | comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas |
Other endpoints? |
Santa Monica Mtns
Status
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
---|---|---|---|---|---|---|
STRESSORS | ||||||
Housing density | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Road effects and accessibility | David | No | No | No | No | added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads |
Pesticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Rodenticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Human footprint | David | Done | Done | Done | 1st draft sent 03/15/10 | awaiting response |
AIR AND CLIMATE | ||||||
Air quality | Patrick | See Tejon GP | No | No | No | have not seen yet |
Climate change | Patrick | NA | Data acquired from A. Flint | to be done | to be done | |
BIOLOGICAL INTEGRITY | ||||||
Invasive plants | David | Done | Done | Done | 1st draft sent 02/02/10 | Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy |
LANDSCAPES | ||||||
Fire-plant community interactions | Frank | In progress | No | No | No | have not seen conceptual model yet |
Climate change-wildfire interaction | David | NA | requested from T. Westerling | to be done | to be done | |
Habitat connectivity | David | Draft | Done-from CEHC | No | No | added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10) |
Light pollution | David | NA | Done | Done | rough draft only 02/08/10 | have not seen yet |
Other endpoints? |