NPS Condition Assessments

From Biogeog
Revision as of 11:07, 2 September 2010 by Stoms (talk | contribs)
Jump to navigationJump to search

Pinnacles

Status 9/1/10

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Text Status Final graphics Feedback from NPS
STRESSORS
Housing density Patrick NA Done Done Draft in report 5/10/10 TBD
Road effects and accessibility David NA Done Done Draft in report 7/29/10 TBD accessibility model reworked with new permeability factors
Pesticides Patrick NA Done Done Draft in report 5/10/10 TBD
Rodenticides Patrick NA Done Done Draft in report 5/25/10 TBD
Human footprint David Done Done Done Draft in report 5/25/10 TBD
AIR AND CLIMATE
Air quality Patrick No Done Done Draft in report 5/25/10 Done
Climate (change) Patrick NA Done Done Draft in report 7/29/10 TBD Plant distributions added
WATER
Water quality David NA Done Done Draft in report 8/28/10 Done minor comments to fix; data for regional context?
BIOLOGICAL INTEGRITY
Invasive plants David Done Done Done Final 9/2/10 TBD just one edit in Findings--done
Feral pigs David Done Done Done 2nd draft in report 02/08/10 TBD Redoing with perennial streams/springs
Prairie falcons Frank Done Done Done 1st Draft in report 7/29/10 TBD revised falcon data spreadsheet--analysis to be redone
LANDSCAPES
Fire regime Frank No Done Done Draft in report 5/10/10, needs minor editing TBD PJ9--wants lit summary of evidence of historical fire back to ~1500
Climate change-wildfire interaction David NA obtained from T. Westerling Done Draft in report 7/29/10 Done
Habitat connectivity David Draft Done-from CEHC Done Draft in report 5/25/10 TBD
Habitat connectivity-badgers Frank Draft Done Done-Circuitscape 2nd draft in report 7/30/10 TBD Frank will redo analysis with pig fence
Dark night sky David NA Done Done 2nd draft in report 02/08/10 Done



Santa Monica Mtns

Status

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Report Status Feedback from NPS
STRESSORS
Housing density Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Road effects and accessibility David No No No No added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads
Pesticides Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Human footprint David Done Done Done 1st draft sent 03/15/10 awaiting response
AIR AND CLIMATE
Air quality Patrick See Tejon GP No No No have not seen yet
Climate change Patrick NA Data acquired from A. Flint to be done to be done
BIOLOGICAL INTEGRITY
Invasive plants David Done Done Done 1st draft sent 02/02/10 Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy
LANDSCAPES
Fire-plant community interactions Frank In progress No No No have not seen conceptual model yet
Climate change-wildfire interaction David NA requested from T. Westerling to be done to be done
Habitat connectivity David Draft Done-from CEHC No No added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
Light pollution David NA Done Done rough draft only 02/08/10 have not seen yet
Other endpoints?