Difference between revisions of "NPS Condition Assessments"
From Biogeog
Jump to navigationJump to search| Line 29: | Line 29: | ||
| Done | | Done | ||
! 2nd draft in report 05/02/11 | ! 2nd draft in report 05/02/11 | ||
| + | | 2nd draft in report | ||
| approved by denise, 5/2/11; still want to redo effective mesh size with evan's new script | | approved by denise, 5/2/11; still want to redo effective mesh size with evan's new script | ||
|-valign="top" | |-valign="top" | ||
| Line 55: | Line 56: | ||
| Done | | Done | ||
| Done | | Done | ||
| − | | 1st draft | + | | 1st draft added to report |
| − | | | + | | 2nd draft in report |
| awaiting response | | awaiting response | ||
|- | |- | ||
| Line 67: | Line 68: | ||
| No | | No | ||
| No | | No | ||
| + | | | ||
| scripts in place to run | | scripts in place to run | ||
|- | |- | ||
| Line 75: | Line 77: | ||
| to be done | | to be done | ||
| to be done | | to be done | ||
| + | | | ||
| scripts in place to run | | scripts in place to run | ||
|- | |- | ||
| Line 85: | Line 88: | ||
| Done | | Done | ||
| 1st draft sent 05/03/11 | | 1st draft sent 05/03/11 | ||
| + | | 1st draft | ||
| | | | ||
|- | |- | ||
| Line 95: | Line 99: | ||
| | | | ||
| | | | ||
| + | | | ||
| build on Noah Goldstein's thesis, check VTM maps/plots for historical distributions | | build on Noah Goldstein's thesis, check VTM maps/plots for historical distributions | ||
|- | |- | ||
| Line 103: | Line 108: | ||
| Done | | Done | ||
! 2nd draft in report 04/27/11 | ! 2nd draft in report 04/27/11 | ||
| + | | 1st draft--2nd to be done soon | ||
| Comments (minor) on 04/06/11 from Irina Irvine, SAMO restoration ecologist | | Comments (minor) on 04/06/11 from Irina Irvine, SAMO restoration ecologist | ||
|- | |- | ||
| Line 113: | Line 119: | ||
| In progress | | In progress | ||
| to be done | | to be done | ||
| + | | | ||
| have not seen conceptual model yet | | have not seen conceptual model yet | ||
|- | |- | ||
| Line 121: | Line 128: | ||
| Done | | Done | ||
| 2nd draft sent 04/18/11 | | 2nd draft sent 04/18/11 | ||
| + | | | ||
| comments from Robert Taylor 03/29/11 and Marti Witter on 04/04/11; needs some major editing and some additional R analysis without urban growth; major revision made to respond to these, 4/18/11 | | comments from Robert Taylor 03/29/11 and Marti Witter on 04/04/11; needs some major editing and some additional R analysis without urban growth; major revision made to respond to these, 4/18/11 | ||
|- | |- | ||
| Line 130: | Line 138: | ||
| | | | ||
| | | | ||
| + | | | ||
|- | |- | ||
|-valign="top" | |-valign="top" | ||
| Line 138: | Line 147: | ||
| Yes | | Yes | ||
| 2nd draft sent 5/11/11 | | 2nd draft sent 5/11/11 | ||
| + | | 1st draft--2nd draft soon | ||
| comments from Denise 3/15/11; discuss the connectivity/corridor analysis of individual species done by SMMC and SCW rather than having a separate section that we write based on Circuitscape | | comments from Denise 3/15/11; discuss the connectivity/corridor analysis of individual species done by SMMC and SCW rather than having a separate section that we write based on Circuitscape | ||
|- | |- | ||
| Line 146: | Line 156: | ||
| Done | | Done | ||
! 2nd draft in report 05/02/11 | ! 2nd draft in report 05/02/11 | ||
| + | ! Done | ||
| approved by denise, 5/2/11 | | approved by denise, 5/2/11 | ||
|- | |- | ||
Revision as of 16:14, 23 June 2011
Contents
Santa Monica Mtns
Status 5/13/11
| Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Graphic status | Feedback from NPS |
|---|---|---|---|---|---|---|---|
| STRESSORS | |||||||
| Housing density | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | 1st draft | awaiting response |
| Road effects and accessibility | David | NA | Done | Done | 2nd draft in report 05/02/11 | 2nd draft in report | approved by denise, 5/2/11; still want to redo effective mesh size with evan's new script |
| Pesticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | 1st draft | awaiting response |
| Rodenticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | 1st draft | awaiting response |
| Human footprint | David | Done | Done | Done | 1st draft added to report | 2nd draft in report | awaiting response |
| AIR AND CLIMATE | |||||||
| Air quality | Patrick | See Tejon GP | No | No | No | scripts in place to run | |
| Climate change | Patrick | NA | Data acquired from A. Flint | to be done | to be done | scripts in place to run | |
| WATER | |||||||
| Water quality | David | NA | TMDL data obtained | Done | 1st draft sent 05/03/11 | 1st draft | |
| BIOLOGICAL INTEGRITY | |||||||
| T&E plants | TBD | build on Noah Goldstein's thesis, check VTM maps/plots for historical distributions | |||||
| Invasive plants | David | Done | Done | Done | 2nd draft in report 04/27/11 | 1st draft--2nd to be done soon | Comments (minor) on 04/06/11 from Irina Irvine, SAMO restoration ecologist |
| LANDSCAPES | |||||||
| Fire-plant community interactions | Frank | In progress | Done | In progress | to be done | have not seen conceptual model yet | |
| Climate change-wildfire interaction | David | NA | acquired from T. Westerling | Done | 2nd draft sent 04/18/11 | comments from Robert Taylor 03/29/11 and Marti Witter on 04/04/11; needs some major editing and some additional R analysis without urban growth; major revision made to respond to these, 4/18/11 | |
| Climate change-sea level rise | Frank | NA | |||||
| Habitat connectivity | David | NA | Done-from CEHC | Yes | 2nd draft sent 5/11/11 | 1st draft--2nd draft soon | comments from Denise 3/15/11; discuss the connectivity/corridor analysis of individual species done by SMMC and SCW rather than having a separate section that we write based on Circuitscape |
| Light pollution | David | NA | Done | Done | 2nd draft in report 05/02/11 | Done | approved by denise, 5/2/11 |
| Other endpoints? |
John Muir
Status 05/19/11
| Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
|---|---|---|---|---|---|---|
| STRESSORS | ||||||
| Housing density??? | Patrick | NA | ||||
| Human footprint | David | Done | ||||
| AIR AND CLIMATE | ||||||
| Air quality??? | No | No | No | scripts in place to run | ||
| Climate change??? | NA | Data acquired from A. Flint | to be done | to be done | scripts in place to run | |
| BIOLOGICAL INTEGRITY | ||||||
| Alameda whipsnake??? | David??? | Critical Habitat for Mt. Wanda region | ||||
| Invasive plants??? | David | Done | ||||
| LANDSCAPES | ||||||
| Fire regime | Frank | No | No | |||
| Climate change-wildfire interaction | David | NA | acquired from T. Westerling | to be done | to be done | R scripts in place to run |
| Habitat connectivity??? | David | No | No-from CEHC | No | No | |
| Other endpoints? |
Pinnacles
Status 9/1/10
| Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Text Status | Final graphics | Feedback from NPS |
|---|---|---|---|---|---|---|---|
| STRESSORS | |||||||
| Housing density | Patrick | NA | Done | Done | Final 9/3/10 | Done | |
| Road effects and accessibility | David | NA | Done | Done | Final 9/2/10 | Done | |
| Pesticides | Patrick | NA | Done | Done | Final 9/2/10 | Done | |
| Rodenticides | Patrick | NA | Done | Done | Final 9/2/10 | Done | |
| Human footprint | David | Done | Done | Done | Final 9/2/10 | Done | |
| AIR AND CLIMATE | |||||||
| Air quality | Patrick | No | Done | Done | Final 9/2/10 | Done | |
| Climate (change) | Patrick | NA | Done | Done | Draft in report 7/29/10 | Done | |
| WATER | |||||||
| Water quality | David | NA | Done | Done | Draft in report 8/28/10 | Done | data for regional context? |
| BIOLOGICAL INTEGRITY | |||||||
| Invasive plants | David | Done | Done | Done | Final 9/2/10 | Done | |
| Feral pigs | David | Done | Done | Done | 2nd draft in report 02/08/10 | TBD | |
| Prairie falcons | Frank | Done | Done | Done | Final 9/2/10 | TBD | revised falcon data spreadsheet--analysis redone; dropped core-noncore comparisons |
| LANDSCAPES | |||||||
| Fire regime | Frank | No | Done | Done | Final 9/2/10 | TBD | added summary of evidence of (pre-)historical fire |
| Climate change-wildfire interaction | David | NA | obtained from T. Westerling | Done | Final 9/2/10 | Done | |
| Habitat connectivity | David | Draft | Done-from CEHC | Done | Final 9/3/10 | TBD | species in connectivity areas not identified |
| Habitat connectivity-badgers | Frank | Draft | Done | Done-Circuitscape | Final 9/2/10 | TBD | Frank redid analysis with pig fence |
| Dark night sky | David | NA | Done | Done | Final 9/2/10 | Done |