Difference between revisions of "NPS Condition Assessments"
From Biogeog
Jump to navigationJump to searchLine 19: | Line 19: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/10/10 | |
| TBD | | TBD | ||
| | | | ||
Line 28: | Line 28: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 7/29/10 | |
| TBD | | TBD | ||
| accessibility model reworked with new permeability factors | | accessibility model reworked with new permeability factors | ||
Line 38: | Line 38: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/10/10 | |
| TBD | | TBD | ||
| | | | ||
Line 48: | Line 48: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/25/10 | |
| TBD | | TBD | ||
| | | | ||
Line 57: | Line 57: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/25/10 | |
| TBD | | TBD | ||
| | | | ||
Line 68: | Line 68: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/25/10 | |
! Done | ! Done | ||
| | | | ||
Line 77: | Line 77: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 7/29/10 | |
| TBD | | TBD | ||
| Plant distributions added | | Plant distributions added | ||
Line 88: | Line 88: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 8/28/10 | |
! Done | ! Done | ||
| minor comments to fix; data for regional context? | | minor comments to fix; data for regional context? | ||
Line 108: | Line 108: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | 2nd draft in report 02/08/10 | |
| TBD | | TBD | ||
| Redoing with perennial streams/springs | | Redoing with perennial streams/springs | ||
Line 117: | Line 117: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | 1st Draft in report 7/29/10 | |
| TBD | | TBD | ||
| revised falcon data spreadsheet--analysis to be redone | | revised falcon data spreadsheet--analysis to be redone | ||
Line 128: | Line 128: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | Draft in report 5/10/10, needs minor editing | |
| TBD | | TBD | ||
| PJ9--wants lit summary of evidence of historical fire back to ~1500 | | PJ9--wants lit summary of evidence of historical fire back to ~1500 | ||
Line 137: | Line 137: | ||
| obtained from T. Westerling | | obtained from T. Westerling | ||
| Done | | Done | ||
− | + | | Draft in report 7/29/10 | |
! Done | ! Done | ||
| | | | ||
Line 147: | Line 147: | ||
| Done-from CEHC | | Done-from CEHC | ||
| Done | | Done | ||
− | + | | Draft in report 5/25/10 | |
| TBD | | TBD | ||
| | | | ||
Line 166: | Line 166: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | | 2nd draft in report 02/08/10 | |
! Done | ! Done | ||
| | | |
Revision as of 12:25, 2 September 2010
Pinnacles
Status 9/1/10
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Text Status | Final graphics | Feedback from NPS |
---|---|---|---|---|---|---|---|
STRESSORS | |||||||
Housing density | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
Road effects and accessibility | David | NA | Done | Done | Draft in report 7/29/10 | TBD | accessibility model reworked with new permeability factors |
Pesticides | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
Rodenticides | Patrick | NA | Done | Done | Draft in report 5/25/10 | TBD | |
Human footprint | David | Done | Done | Done | Draft in report 5/25/10 | TBD | |
AIR AND CLIMATE | |||||||
Air quality | Patrick | No | Done | Done | Draft in report 5/25/10 | Done | |
Climate (change) | Patrick | NA | Done | Done | Draft in report 7/29/10 | TBD | Plant distributions added |
WATER | |||||||
Water quality | David | NA | Done | Done | Draft in report 8/28/10 | Done | minor comments to fix; data for regional context? |
BIOLOGICAL INTEGRITY | |||||||
Invasive plants | David | Done | Done | Done | Final 9/2/10 | TBD | just one edit in Findings--done |
Feral pigs | David | Done | Done | Done | 2nd draft in report 02/08/10 | TBD | Redoing with perennial streams/springs |
Prairie falcons | Frank | Done | Done | Done | 1st Draft in report 7/29/10 | TBD | revised falcon data spreadsheet--analysis to be redone |
LANDSCAPES | |||||||
Fire regime | Frank | No | Done | Done | Draft in report 5/10/10, needs minor editing | TBD | PJ9--wants lit summary of evidence of historical fire back to ~1500 |
Climate change-wildfire interaction | David | NA | obtained from T. Westerling | Done | Draft in report 7/29/10 | Done | |
Habitat connectivity | David | Draft | Done-from CEHC | Done | Draft in report 5/25/10 | TBD | |
Habitat connectivity-badgers | Frank | Draft | Done | Done-Circuitscape | Final 9/2/10 | TBD | Frank redid analysis with pig fence |
Dark night sky | David | NA | Done | Done | 2nd draft in report 02/08/10 | Done |
Santa Monica Mtns
Status
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
---|---|---|---|---|---|---|
STRESSORS | ||||||
Housing density | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Road effects and accessibility | David | No | No | No | No | added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads |
Pesticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Rodenticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Human footprint | David | Done | Done | Done | 1st draft sent 03/15/10 | awaiting response |
AIR AND CLIMATE | ||||||
Air quality | Patrick | See Tejon GP | No | No | No | have not seen yet |
Climate change | Patrick | NA | Data acquired from A. Flint | to be done | to be done | |
BIOLOGICAL INTEGRITY | ||||||
Invasive plants | David | Done | Done | Done | 1st draft sent 02/02/10 | Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy |
LANDSCAPES | ||||||
Fire-plant community interactions | Frank | In progress | No | No | No | have not seen conceptual model yet |
Climate change-wildfire interaction | David | NA | requested from T. Westerling | to be done | to be done | |
Habitat connectivity | David | Draft | Done-from CEHC | No | No | added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10) |
Light pollution | David | NA | Done | Done | rough draft only 02/08/10 | have not seen yet |
Other endpoints? |