Difference between revisions of "NPS Condition Assessments"
From Biogeog
Jump to navigationJump to searchLine 1: | Line 1: | ||
=Pinnacles= | =Pinnacles= | ||
− | == | + | ==Status 9/1/10== |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
{| class="wikitable", border="1" cellpadding="2" | {| class="wikitable", border="1" cellpadding="2" | ||
|- | |- | ||
Line 174: | Line 88: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | ! Draft in report 8/28/10 | |
| Done | | Done | ||
| minor comments to fix | | minor comments to fix | ||
Line 185: | Line 99: | ||
| Done | | Done | ||
| Done | | Done | ||
− | + | ! Draft in report 8/28/10 | |
| TBD | | TBD | ||
− | | | + | | just one edit in Findings |
|- | |- | ||
! Feral pigs | ! Feral pigs |
Revision as of 11:42, 1 September 2010
Pinnacles
Status 9/1/10
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Final graphics | Feedback from NPS |
---|---|---|---|---|---|---|---|
STRESSORS | |||||||
Housing density | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
Road effects and accessibility | David | NA | Done | Done | Draft in report 7/29/10 | TBD | accessibility model reworked with new permeability factors |
Pesticides | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
Rodenticides | Patrick | NA | Done | Done | Draft in report 5/25/10 | TBD | |
Human footprint | David | Done | Done | Done | Draft in report 5/25/10 | TBD | |
AIR AND CLIMATE | |||||||
Air quality | Patrick | No | Done | Done | Draft in report 5/25/10 | Done | |
Climate (change) | Frank/Patrick | NA | Done | Done | Draft in report 7/29/10 | TBD | Plant distributions added |
WATER | |||||||
Water quality | David | NA | Done | Done | Draft in report 8/28/10 | Done | minor comments to fix |
BIOLOGICAL INTEGRITY | |||||||
Invasive plants | David | Done | Done | Done | Draft in report 8/28/10 | TBD | just one edit in Findings |
Feral pigs | David | Done | Done | Done | 2nd draft in report 02/08/10 | TBD | |
Prairie falcons | Frank | Done | Done | Done | 1st Draft in report 7/29/10 | TBD | revised falcon data spreadsheet--analysis to be redone |
LANDSCAPES | |||||||
Fire regime | Frank | No | Done | Done | Draft in report 5/10/10, needs minor editing | TBD | PJ9--wants lit summary of evidence of historical fire back to ~1500 |
Climate change-wildfire interaction | David | NA | obtained from T. Westerling | Done | Draft in report 7/29/10 | Done | |
Habitat connectivity | David | Draft | Done-from CEHC | Done | Draft in report 5/25/10 | TBD | |
Habitat connectivity-badgers | Frank | Draft | Done | Done-Circuitscape | 2nd draft in report 7/30/10 | TBD | Frank will redo analysis with pig fence |
Dark night sky | David | NA | Done | Done | 2nd draft in report 02/08/10 | Done |
Santa Monica Mtns
Status
Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
---|---|---|---|---|---|---|
STRESSORS | ||||||
Housing density | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Road effects and accessibility | David | No | No | No | No | added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads |
Pesticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Rodenticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
Human footprint | David | Done | Done | Done | 1st draft sent 03/15/10 | awaiting response |
AIR AND CLIMATE | ||||||
Air quality | Patrick | See Tejon GP | No | No | No | have not seen yet |
Climate change | Patrick | NA | Data acquired from A. Flint | to be done | to be done | |
BIOLOGICAL INTEGRITY | ||||||
Invasive plants | David | Done | Done | Done | 1st draft sent 02/02/10 | Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy |
LANDSCAPES | ||||||
Fire-plant community interactions | Frank | In progress | No | No | No | have not seen conceptual model yet |
Climate change-wildfire interaction | David | NA | requested from T. Westerling | to be done | to be done | |
Habitat connectivity | David | Draft | Done-from CEHC | No | No | added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10) |
Light pollution | David | NA | Done | Done | rough draft only 02/08/10 | have not seen yet |
Other endpoints? |