Difference between revisions of "NPS Condition Assessments"
From Biogeog
Jump to navigationJump to search| Line 95: | Line 95: | ||
! Analysis Done | ! Analysis Done | ||
! Report Status | ! Report Status | ||
| + | ! Final graphics | ||
! Feedback from NPS | ! Feedback from NPS | ||
|- | |- | ||
| Line 105: | Line 106: | ||
| Done | | Done | ||
! Draft in report 5/10/10 | ! Draft in report 5/10/10 | ||
| + | | TBD | ||
| | | | ||
|- | |- | ||
| Line 113: | Line 115: | ||
| Done | | Done | ||
! Draft in report 7/29/10 | ! Draft in report 7/29/10 | ||
| + | | TBD | ||
| accessibility model reworked with new permeability factors | | accessibility model reworked with new permeability factors | ||
|- | |- | ||
| Line 122: | Line 125: | ||
| Done | | Done | ||
! Draft in report 5/10/10 | ! Draft in report 5/10/10 | ||
| + | | TBD | ||
| | | | ||
|- | |- | ||
| Line 131: | Line 135: | ||
| Done | | Done | ||
! Draft in report 5/25/10 | ! Draft in report 5/25/10 | ||
| + | | TBD | ||
| | | | ||
|- | |- | ||
| Line 139: | Line 144: | ||
| Done | | Done | ||
! Draft in report 5/25/10 | ! Draft in report 5/25/10 | ||
| + | | TBD | ||
| | | | ||
|- | |- | ||
| Line 149: | Line 155: | ||
| Done | | Done | ||
! Draft in report 5/25/10 | ! Draft in report 5/25/10 | ||
| + | | Done | ||
| | | | ||
|- | |- | ||
| Line 154: | Line 161: | ||
| Frank/Patrick | | Frank/Patrick | ||
| NA | | NA | ||
| − | | | + | | Done |
| Done | | Done | ||
! Draft in report 7/29/10 | ! Draft in report 7/29/10 | ||
| + | | TBD | ||
| Plant distributions added | | Plant distributions added | ||
| + | |- | ||
| + | ! WATER | ||
| + | |- | ||
| + | ! Water quality | ||
| + | | David | ||
| + | | NA | ||
| + | | Done | ||
| + | | Done | ||
| + | | 1st draft sent 8/19/10 | ||
| + | | Done | ||
| + | | minor comments to fix | ||
|- | |- | ||
! BIOLOGICAL INTEGRITY | ! BIOLOGICAL INTEGRITY | ||
| Line 163: | Line 182: | ||
! Invasive plants | ! Invasive plants | ||
| David | | David | ||
| − | | | + | | Done |
| − | | | + | | Done |
| − | + | | Done | |
| − | | | + | | 1st draft sent 8/24/10 |
| − | | | + | | TBD |
| + | | | ||
|- | |- | ||
! Feral pigs | ! Feral pigs | ||
Revision as of 11:43, 24 August 2010
Contents
Pinnacles
Todo List for completing draft report 7/29/10
| Who | Section | Task | Due date | Status |
|---|---|---|---|---|
| Patrick | Chap 4--Climate | add one or two plant distribution predictions | 7/30/10 | Done 7/29/10 |
| Patrick | Chap 4--Air | change scale of sulfur deposition bar graph | 7/30/10 | Done 7/27/10 |
| Frank | Chap 4--Fire regime | add text speculating about prehistoric fire regime | 7/30/10 | |
| Frank | Chap 4--Badger connectivity | consider redoing modeling with pig fence as barrier | 7/30/10 | David can respond to the other NPS comments 7/30/10 |
| David | Chap 4--Climate change/wildfire | respond to minor NPS comments | 7/30/10 | Done 7/27/10 |
| David | Chap 4--roads | revising model with new permeability factors | 7/30/10 | Done |
| David | Chap 4--human footprint | add details about top-down and bottom-up models | 7/30/10 | Done 7/27/10 |
| David | Chap 4--invasive plants | incorporate text and add placeholder for invasive species data (exposure component) | 7/30/10 | |
| David | Chap 4--dark night sky | respond to NPS comments | 7/30/10 | Done 7/27/10 |
| David | Exec Summary | finish discussion summary | 7/30/10 | |
| David | Chap 2--Setting | insert section on climate change models and scenarios | 7/30/10 | Done 7.30/10 |
| David | Chap 5--Discussion | finish discussion | 7/30/10 |
Status 7/26/10
| Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Final graphics | Feedback from NPS |
|---|---|---|---|---|---|---|---|
| STRESSORS | |||||||
| Housing density | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
| Road effects and accessibility | David | NA | Done | Done | Draft in report 7/29/10 | TBD | accessibility model reworked with new permeability factors |
| Pesticides | Patrick | NA | Done | Done | Draft in report 5/10/10 | TBD | |
| Rodenticides | Patrick | NA | Done | Done | Draft in report 5/25/10 | TBD | |
| Human footprint | David | Done | Done | Done | Draft in report 5/25/10 | TBD | |
| AIR AND CLIMATE | |||||||
| Air quality | Patrick | No | Done | Done | Draft in report 5/25/10 | Done | |
| Climate (change) | Frank/Patrick | NA | Done | Done | Draft in report 7/29/10 | TBD | Plant distributions added |
| WATER | |||||||
| Water quality | David | NA | Done | Done | 1st draft sent 8/19/10 | Done | minor comments to fix |
| BIOLOGICAL INTEGRITY | |||||||
| Invasive plants | David | Done | Done | Done | 1st draft sent 8/24/10 | TBD | |
| Feral pigs | David | Done | Done | Done | 2nd draft in report 02/08/10 | ||
| Prairie falcons | Frank | Done | Done | Done | 1st Draft in report 7/29/10 | NPS have not seen yet | |
| Cal red-legged frogs | Patrick | Done | No | No | No | comments on draft conceptual model--revisions made 12/16/09 | |
| LANDSCAPES | |||||||
| Fire regime | Frank | No | Done | Done | Draft in report 5/10/10, needs minor editing | PJ9--wants lit summary of evidence of historical fire back to ~1500 | |
| Climate change-wildfire interaction | David | NA | obtained from T. Westerling | Done | Draft in report 7/29/10 | ||
| Habitat connectivity | David | Draft | Done-from CEHC | Done | Draft in report 5/25/10 | ||
| Habitat connectivity-badgers | Frank | Draft | Done | Done-Circuitscape | 2nd draft in report 7/30/10 | Frank will also do CircuitScape analysis for SJ coachwhip | |
| Dark night sky | David | NA | Done | Done | 2nd draft in report 02/08/10 | ||
| Other endpoints? |
Santa Monica Mtns
Status
| Stressor/Indicator | Who | Conceptual Model | Data Compiled | Analysis Done | Report Status | Feedback from NPS |
|---|---|---|---|---|---|---|
| STRESSORS | ||||||
| Housing density | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
| Road effects and accessibility | David | No | No | No | No | added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads |
| Pesticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
| Rodenticides | Patrick | NA | Done | Done | 1st draft sent 5/19/10 | awaiting response |
| Human footprint | David | Done | Done | Done | 1st draft sent 03/15/10 | awaiting response |
| AIR AND CLIMATE | ||||||
| Air quality | Patrick | See Tejon GP | No | No | No | have not seen yet |
| Climate change | Patrick | NA | Data acquired from A. Flint | to be done | to be done | |
| BIOLOGICAL INTEGRITY | ||||||
| Invasive plants | David | Done | Done | Done | 1st draft sent 02/02/10 | Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy |
| LANDSCAPES | ||||||
| Fire-plant community interactions | Frank | In progress | No | No | No | have not seen conceptual model yet |
| Climate change-wildfire interaction | David | NA | requested from T. Westerling | to be done | to be done | |
| Habitat connectivity | David | Draft | Done-from CEHC | No | No | added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10) |
| Light pollution | David | NA | Done | Done | rough draft only 02/08/10 | have not seen yet |
| Other endpoints? |