Difference between revisions of "NPS Condition Assessments"

From Biogeog
Jump to navigationJump to search
Line 34: Line 34:
 
| Done
 
| Done
 
| Done
 
| Done
| internal draft 4/26/10
+
| 1st draft sent 5/19/10
| not sent to NPS yet
+
| awaiting response
 
|-
 
|-
 
! Feral pigs
 
! Feral pigs
Line 80: Line 80:
 
| Patrick
 
| Patrick
 
| No
 
| No
| In progress
+
| Done
| No
+
| Done
| No
+
| 1st draft sent 5/19/10
| have not seen yet
+
| awaiting response
 
|-
 
|-
 
! Light pollution
 
! Light pollution
Line 99: Line 99:
 
| Done
 
| Done
 
| 1st draft sent 03/15/10
 
| 1st draft sent 03/15/10
|  
+
| awaiting response
 
|-
 
|-
 
! Vegetation
 
! Vegetation
Line 123: Line 123:
 
| Done-from CEHC
 
| Done-from CEHC
 
| Done
 
| Done
| Internal draft to FD/PJ 4/29/10
+
| 1st draft sent 5/19/10
| Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
+
| awaiting response
 
|-
 
|-
 
! Climate change-wildfire interaction
 
! Climate change-wildfire interaction
Line 189: Line 189:
 
| NA
 
| NA
 
| Done
 
| Done
| No
+
| Done
| internal draft done 4/5/10
+
| 1st draft sent 5/19/10
| have not seen yet
+
| awaiting response
 
|-
 
|-
 
|-valign="top"
 
|-valign="top"
Line 199: Line 199:
 
| Done
 
| Done
 
| Done
 
| Done
| internal draft done 4/5/10
+
| 1st draft sent 5/19/10
| NPS has not seen yet
+
| awaiting response
 
|-
 
|-
 
|-valign="top"
 
|-valign="top"
Line 208: Line 208:
 
| Done
 
| Done
 
| Done
 
| Done
| internal draft 5/4/10
+
| 1st draft sent 5/19/10
| not sent to NPS yet
+
| awaiting response
 
|-
 
|-
 
! Air quality
 
! Air quality
Line 233: Line 233:
 
| Done
 
| Done
 
| 1st draft sent 03/15/10
 
| 1st draft sent 03/15/10
|  
+
| awaiting response
 
|-
 
|-
 
! Climate change-wildfire interaction
 
! Climate change-wildfire interaction

Revision as of 13:10, 19 May 2010

Pinnacles

Status

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Report Status Feedback from NPS
Fire regime Frank No Done Done Draft in report 5/10/10, needs minor editing PJ9--wants lit summary of evidence of historical fire back to ~1500
Pesticides Patrick NA Done Done Draft in report 5/10/10, needs minor editing
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Feral pigs David Done Done Done 2nd draft in report 02/08/10
Climate change Frank/Patrick NA Data acquired from A. Flint To be done To be done have not seen yet
Housing density Patrick NA Done Done Draft in report 5/10/10
Prairie falcons Frank Done Done Nearly done In progress have not seen yet
Cal red-legged frogs Patrick Done No No No comments on draft conceptual model--revisions made 12/16/09
Air quality Patrick No Done Done 1st draft sent 5/19/10 awaiting response
Light pollution David NA Done Done 2nd draft in report 02/08/10 comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
Human footprint David Done Done Done 1st draft sent 03/15/10 awaiting response
Vegetation Frank David to draft model No No No have not seen yet
Invasive plants David revised 54/29/10 as per Paul Paul is checking to be done to be done Paul J. would like SAMO-type analysis except with their weed zones and numbers of priority invasives to replace Bren GP exposure ranking
Habitat connectivity David Draft Done-from CEHC Done 1st draft sent 5/19/10 awaiting response
Climate change-wildfire interaction David NA requested from T. Westerling to be done to be done
Other endpoints?


Santa Monica Mtns

Status

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Report Status Feedback from NPS
Fire-plant community interactions Frank In progress No No No have not seen conceptual model yet
Habitat connectivity David Draft Done-from CEHC No No Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
Invasive plants David Done Done Done 1st draft sent 02/02/10 Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy
Climate change Patrick NA Data acquired from A. Flint to be done to be done
Housing density Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Pesticides Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 awaiting response
Air quality Patrick See Tejon GP No No No have not seen yet
Light pollution David NA Done Done 1st draft in report 02/08/10
Human footprint David Done Done Done 1st draft sent 03/15/10 awaiting response
Climate change-wildfire interaction David NA requested from T. Westerling to be done to be done
Other endpoints?