Difference between revisions of "NPS Condition Assessments"

From Biogeog
Jump to navigationJump to search
Line 16: Line 16:
 
| Done
 
| Done
 
| Done
 
| Done
| Draft in report 5/10/10, needs minor editing
+
! Draft in report 5/10/10, needs minor editing
 
| PJ9--wants lit summary of evidence of historical fire back to ~1500
 
| PJ9--wants lit summary of evidence of historical fire back to ~1500
 
|-
 
|-
Line 25: Line 25:
 
| Done
 
| Done
 
| Done
 
| Done
| Draft in report 5/10/10, needs minor editing
+
! Draft in report 5/10/10, needs minor editing
 
|  
 
|  
 
|-
 
|-
Line 42: Line 42:
 
| Done
 
| Done
 
| Done
 
| Done
| 2nd draft in report 02/08/10
+
! 2nd draft in report 02/08/10
 
|  
 
|  
 
|-
 
|-
Line 58: Line 58:
 
| Done
 
| Done
 
| Done
 
| Done
| Draft in report 5/10/10
+
! Draft in report 5/10/10
 
|  
 
|  
 
|-
 
|-
Line 90: Line 90:
 
| Done
 
| Done
 
| Done
 
| Done
| 2nd draft in report 02/08/10
+
! 2nd draft in report 02/08/10
 
| comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
 
| comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
 
|-
 
|-

Revision as of 14:37, 13 May 2010

Pinnacles

Status

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Report Status Feedback from NPS
Fire regime Frank No Done Done Draft in report 5/10/10, needs minor editing PJ9--wants lit summary of evidence of historical fire back to ~1500
Pesticides Patrick NA Done Done Draft in report 5/10/10, needs minor editing
Rodenticides Patrick NA Done Done internal draft 4/26/10 not sent to NPS yet
Feral pigs David Done Done Done 2nd draft in report 02/08/10
Climate change Frank/Patrick NA Data acquired from A. Flint To be done To be done have not seen yet
Housing density Patrick NA Done Done Draft in report 5/10/10
Prairie falcons Frank Done Done Nearly done In progress have not seen yet
Cal red-legged frogs Patrick Done No No No comments on draft conceptual model--revisions made 12/16/09
Air quality Patrick No In progress No No have not seen yet
Light pollution David NA Done Done 2nd draft in report 02/08/10 comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
Human footprint David Done Done Done 1st draft sent 03/15/10
Vegetation Frank David to draft model No No No have not seen yet
Invasive plants David revised 54/29/10 as per Paul Paul is checking to be done to be done Paul J. would like SAMO-type analysis except with their weed zones and numbers of priority invasives to replace Bren GP exposure ranking
Habitat connectivity David Draft Done-from CEHC Done Internal draft to FD/PJ 4/29/10 Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
Climate change-wildfire interaction David NA requested from T. Westerling to be done to be done
Other endpoints?


Santa Monica Mtns

Status

Stressor/Indicator Who Conceptual Model Data Compiled Analysis Done Report Status Feedback from NPS
Fire-plant community interactions Frank In progress No No No have not seen conceptual model yet
Habitat connectivity David Draft Done-from CEHC No No Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
Invasive plants David Done Done Done 1st draft sent 02/02/10 Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy
Climate change Patrick NA Data acquired from A. Flint to be done to be done
Housing density Patrick NA Done No internal draft done 4/5/10 have not seen yet
Pesticides Patrick NA Done Done internal draft done 4/5/10 NPS has not seen yet
Rodenticides Patrick NA Done Done internal draft 5/4/10 not sent to NPS yet
Air quality Patrick See Tejon GP No No No have not seen yet
Light pollution David NA Done Done 1st draft in report 02/08/10
Human footprint David Done Done Done 1st draft sent 03/15/10
Climate change-wildfire interaction David NA requested from T. Westerling to be done to be done
Other endpoints?