Difference between revisions of "NPS Condition Assessments"

From Biogeog
Jump to navigationJump to search
 
(138 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Pinnacles=
+
=John Muir=
==Todo List for completing draft report 7/29/10==
+
==Status 10/28/11==
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
! Who
 
! Section
 
! Task
 
! Due date
 
! Status
 
|-
 
| Patrick
 
| Chap 4--Climate
 
| add one or two plant distribution predictions
 
| 7/30/10
 
| Done
 
|-
 
| Patrick
 
| Chap 4--Air
 
| change scale of sulfur deposition bar graph
 
| 7/30/10
 
| Done 7/27/10
 
|-
 
| Frank
 
| Chap 4--Fire regime
 
| add text speculating about prehistoric fire regime
 
| 7/30/10
 
|
 
|-
 
| Frank
 
| Chap 4--Badger connectivity
 
| consider redoing modeling with pig fence as barrier; David can respond to the other NPS comments
 
| 7/30/10
 
|
 
|-
 
| David
 
| Chap 4--Climate change/wildfire
 
| respond to minor NPS comments
 
| 7/30/10
 
| Done 7/27/10
 
|-
 
| David
 
| Chap 4--roads
 
| revising model with new permeability factors
 
| 7/30/10
 
| Done
 
|-
 
| David
 
| Chap 4--human footprint
 
| add details about top-down and bottom-up models
 
| 7/30/10
 
| Done 7/27/10
 
|-
 
| David
 
| Chap 4--invasive plants
 
| incorporate text and add placeholder for invasive species data (exposure component)
 
| 7/30/10
 
|
 
|-
 
| David
 
| Chap 4--dark night sky
 
| respond to NPS comments
 
| 7/30/10
 
| Done 7/27/10
 
|-
 
| David
 
| Exec Summary
 
| finish discussion summary
 
| 7/30/10
 
|
 
|-
 
| David
 
| Chap 2--Setting
 
| insert section on climate change models and scenarios
 
| 7/30/10
 
|
 
|-
 
| David
 
| Chap 5--Discussion
 
| finish discussion
 
| 7/30/10
 
|
 
 
 
|}
 
 
 
<p>
 
<br>
 
 
 
==Status 7/26/10==
 
 
{| class="wikitable", border="1" cellpadding="2"
 
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
|-
 
! Stressor/Indicator
 
! Stressor/Indicator
! Who
+
! Due/Done
 
! Conceptual Model
 
! Conceptual Model
 
! Data Compiled
 
! Data Compiled
 
! Analysis Done
 
! Analysis Done
 
! Report Status
 
! Report Status
 +
! Graphic status
 
! Feedback from NPS
 
! Feedback from NPS
 
|-
 
|-
Line 100: Line 15:
 
|-
 
|-
 
! Housing density
 
! Housing density
| Patrick
+
! Done
| NA
 
| Done
 
| Done
 
! Draft in report 5/10/10
 
|
 
|-
 
! Road effects and accessibility
 
| David
 
| NA
 
 
| Done
 
| Done
| Done
 
! Draft in report 7/29/10
 
| accessibility model reworked with new permeability factors
 
|-
 
|-valign="top"
 
! Pesticides
 
| Patrick
 
| NA
 
 
| Done
 
| Done
 
| Done
 
| Done
! Draft in report 5/10/10
+
! 2nd draft in report 10/28/11
|
+
! Done
|-
+
| reviewed by lisa sanders 10/21/11
|-valign="top"
 
! Rodenticides
 
| Patrick
 
| NA
 
| Done
 
| Done
 
! Draft in report 5/25/10
 
|
 
 
|-
 
|-
 
! Human footprint
 
! Human footprint
| David
+
! Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
! Draft in report 5/25/10
+
! 2nd draft in report 10/12/11
|  
+
! Done
 +
| reviewed by Fernando 10/07/11
 
|-
 
|-
 
! AIR AND CLIMATE
 
! AIR AND CLIMATE
 
|-
 
|-
 
! Air quality
 
! Air quality
| Patrick
+
! Done
| No
+
| done
| Done
+
| done
| Done
+
| done
! Draft in report 5/25/10
+
! 2nd draft in report 10/14/11
 +
! Done
 +
| reviewed by Fernando 10/11/11
 +
|-
 +
! Climate
 
|  
 
|  
|-
 
! Climate (change)
 
| Frank/Patrick
 
 
| NA
 
| NA
| Data acquired from A. Flint
 
 
| Done
 
| Done
! Draft in report 7/29/10
+
| done
| Plant distributions added
+
! 2nd draft in report 10/17/11
 +
! Done
 +
| reviewed by Fernando 10/11/11
 +
|-
 +
 
 +
! WATER
 +
|-
 +
! Hydrology and water quality
 +
! Done
 +
| done
 +
| done
 +
| done
 +
! 2nd draft in report 10/14/11
 +
! Done
 +
| reviewed by Fernando 10/31/11
 +
 
 
|-
 
|-
 
! BIOLOGICAL INTEGRITY
 
! BIOLOGICAL INTEGRITY
 
|-
 
|-
! Invasive plants
+
! Alameda whipsnake
| David
+
! Done
| revised 4/29/10 as per Paul
 
| Paul sent weed zone shapefile; is getting weed presence/absence data for them
 
| In progress
 
| In progress
 
| Paul J. would like SAMO-type analysis except with their weed zones and numbers of priority invasives to replace Bren GP exposure ranking
 
|-
 
! Feral pigs
 
| David
 
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
! 2nd draft in report 02/08/10
+
! 2nd draft in report 10/14/11
|  
+
! Done
 +
| reviewed by Fernando 10/07/11
 
|-
 
|-
! Prairie falcons
+
! Invasive plants and disease (SOD)
| Frank
+
| David
| Done
 
 
| Done
 
| Done
 
| Done
 
| Done
| 1st Draft in report 7/29/10
 
| NPS have not seen yet
 
|-
 
! Cal red-legged frogs
 
| Patrick
 
 
| Done
 
| Done
| No
+
! 2nd draft in report 11/07/11
| No
+
! Done
| No
+
| reviewed by Fernando 11/04/11
| comments on draft conceptual model--revisions made 12/16/09
 
 
|-
 
|-
 
! LANDSCAPES
 
! LANDSCAPES
 
|-
 
|-
 
! Fire regime
 
! Fire regime
| Frank
+
! Done
| No
 
 
| Done
 
| Done
 
| Done
 
| Done
! Draft in report 5/10/10, needs minor editing
+
| Done
| PJ9--wants lit summary of evidence of historical fire back to ~1500
+
! 2nd draft in report 11/03/11
 +
! Done
 +
| reviewed by Fernando 10/31/11
 
|-
 
|-
! Climate change-wildfire interaction
+
! Future fire regime
| David
+
! Done
| NA
+
| Done
| obtained from T. Westerling
+
| Done
 
| Done
 
| Done
! Draft in report 7/29/10
+
! 2nd draft in report 10/24/11
|  
+
! Done
 +
| reviewed by Fernando 10/20/11
 
|-
 
|-
 
|-valign="top"
 
|-valign="top"
 
! Habitat connectivity
 
! Habitat connectivity
| David
+
! Done
| Draft
 
| Done-from CEHC
 
 
| Done
 
| Done
! Draft in report 5/25/10
 
|
 
|-
 
|-valign="top"
 
! Habitat connectivity-badgers
 
| Frank
 
| Draft
 
| Done
 
| Done-Circuitscape
 
| 1st draft sent 7/12/10
 
| Frank will also do CircuitScape analysis for SJ coachwhip
 
|-
 
! Dark night sky
 
| David
 
| NA
 
 
| Done
 
| Done
 
| Done
 
| Done
! 2nd draft in report 02/08/10
+
! 2nd draft in report 10/13/11
| comments from PJ/MK about prison lights, vineyard night harvesting, and NPS Night Skies program; possibly add 2000 results if Albers does the analysis or use Cinzano et al. atlas
+
! Done
 +
| reviewed by Fernando 10/07/11
 
|-
 
|-
! Other endpoints?
 
 
|}
 
|}
 
<p>
 
 
<br>
 
<br>
 
+
<br>
 
=Santa Monica Mtns=
 
=Santa Monica Mtns=
==Status==
+
==Status 09/02/11==
 
{| class="wikitable", border="1" cellpadding="2"
 
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
|-
 
! Stressor/Indicator
 
! Stressor/Indicator
! Who
+
! Due/Done
 
! Conceptual Model
 
! Conceptual Model
 
! Data Compiled
 
! Data Compiled
 
! Analysis Done
 
! Analysis Done
 
! Report Status
 
! Report Status
 +
! Graphic status
 
! Feedback from NPS
 
! Feedback from NPS
 
|-
 
|-
Line 258: Line 134:
 
|-
 
|-
 
! Housing density
 
! Housing density
| Patrick
+
! Done
 
| NA
 
| NA
 
| Done
 
| Done
 
| Done
 
| Done
| 1st draft sent 5/19/10
+
! 2nd draft in report 07/28/11
| awaiting response
+
! Done
 +
| approved by denise 7/27/11
 
|-
 
|-
 
! Road effects and accessibility
 
! Road effects and accessibility
| David
+
! Done
| No
+
| NA
| No
+
| Done
| No
+
| Done
| No
+
! 2nd draft in report 05/02/11
| added 6/2/10--see ROMO report on accessibility; NPScape has models for density, distance, and area without roads
+
! Done
|-
+
| approved by denise, 5/2/11
 
|-valign="top"
 
|-valign="top"
 
! Pesticides
 
! Pesticides
| Patrick
+
! Done
 
| NA
 
| NA
 
| Done
 
| Done
 
| Done
 
| Done
| 1st draft sent 5/19/10
+
! 1st draft in report 08/08/11
| awaiting response
+
! Done
 +
| approved by denise 08/05/11
 
|-
 
|-
 
|-valign="top"
 
|-valign="top"
Line 289: Line 167:
 
| Done
 
| Done
 
| 1st draft sent 5/19/10
 
| 1st draft sent 5/19/10
 +
| 1st draft
 
| awaiting response
 
| awaiting response
 
|-
 
|-
 
! Human footprint
 
! Human footprint
| David
+
! Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| 1st draft sent 03/15/10
+
! 1st draft in report 08/06/11
| awaiting response
+
! Done
 +
| approved by denise 08/05/11
 
|-
 
|-
 
! AIR AND CLIMATE
 
! AIR AND CLIMATE
 
|-
 
|-
 
! Air quality
 
! Air quality
| Patrick
+
! Done
| See Tejon GP
+
| NA
| No
+
| Done
| No
+
| Done
| No
+
! 2nd draft in report 07/28/11
| have not seen yet
+
! Done
 +
| approved by denise 7/27/11
 +
|-
 +
! Climate
 +
! Done
 +
| NA
 +
| Done
 +
| Done
 +
! 1st draft in report 08/07/11
 +
! Done
 +
| approved by denise 08/05/11
 +
|-
 +
! WATER
 
|-
 
|-
! Climate change
+
! Water quality
| Patrick
+
! Done
 
| NA
 
| NA
| Data acquired from A. Flint
+
| TMDL data obtained
| to be done
+
| Done
| to be done
+
! 1st draft in report 08/07/11
|  
+
! Done
 +
| approved by densie 08/05/11
 
|-
 
|-
 
! BIOLOGICAL INTEGRITY
 
! BIOLOGICAL INTEGRITY
 
|-
 
|-
 
! Invasive plants
 
! Invasive plants
| David
+
! Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
 
| Done
| 1st draft sent 02/02/10
+
! 2nd draft in report 04/27/11
| Comments from MK as of 02/03/10; DK liked conceptual model of vulnerability; waiting for comments from Christy
+
! Done
 +
| approved
 
|-
 
|-
 
! LANDSCAPES
 
! LANDSCAPES
 
|-
 
|-
! Fire-plant community interactions
+
! Fire regime
| Frank
+
| 7/30/11
| In progress
+
| Done
| No
+
| Done
| No
+
| Done
| No
+
| 1st draft done 10/31/11
| have not seen conceptual model yet
+
| 1st draft done 10/31/11
 +
| awaiting comments
 
|-
 
|-
! Climate change-wildfire interaction
+
! Future fire regime
| David
+
! Done
 
| NA
 
| NA
| requested from T. Westerling
+
| acquired from T. Westerling
| to be done
+
| Done
| to be done
+
! 2nd draft in report 08/01/11
|
+
! Done
|-
+
| final comments by Marti Witter and Denise on 07/28/11
 
|-valign="top"
 
|-valign="top"
 
! Habitat connectivity
 
! Habitat connectivity
| David
+
! Done
| Draft
+
| NA
 
| Done-from CEHC
 
| Done-from CEHC
| No
+
| Yes
| No
+
! 2nd draft in report 06/24/11
| added 6/2/10--Frank will do some CircuitScape analysis for species to be identified by SAMO; Comments on conceptual model only from MK as of 12/22/09; adapt Cal Essential Habitat Connectivity (04/27/10)
+
! Done
 +
| approved 7/12/11
 
|-
 
|-
 
! Light pollution
 
! Light pollution
| David
+
! Done
 
| NA
 
| NA
 
| Done
 
| Done
 
| Done
 
| Done
| rough draft only 02/08/10
+
! 2nd draft in report 05/02/11
| have not seen yet
+
! Done
 +
| approved by denise, 5/2/11
 
|-
 
|-
! Other endpoints?
 
 
|}
 
|}
 +
<br>
 +
<br>
 +
 +
  
 
----
 
----
  
 
----
 
----

Latest revision as of 21:21, 7 November 2011

John Muir

Status 10/28/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density Done Done Done Done 2nd draft in report 10/28/11 Done reviewed by lisa sanders 10/21/11
Human footprint Done Done Done Done 2nd draft in report 10/12/11 Done reviewed by Fernando 10/07/11
AIR AND CLIMATE
Air quality Done done done done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/11/11
Climate NA Done done 2nd draft in report 10/17/11 Done reviewed by Fernando 10/11/11
WATER
Hydrology and water quality Done done done done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/31/11
BIOLOGICAL INTEGRITY
Alameda whipsnake Done Done Done Done 2nd draft in report 10/14/11 Done reviewed by Fernando 10/07/11
Invasive plants and disease (SOD) David Done Done Done 2nd draft in report 11/07/11 Done reviewed by Fernando 11/04/11
LANDSCAPES
Fire regime Done Done Done Done 2nd draft in report 11/03/11 Done reviewed by Fernando 10/31/11
Future fire regime Done Done Done Done 2nd draft in report 10/24/11 Done reviewed by Fernando 10/20/11
Habitat connectivity Done Done Done Done 2nd draft in report 10/13/11 Done reviewed by Fernando 10/07/11



Santa Monica Mtns

Status 09/02/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Road effects and accessibility Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11
Pesticides Done NA Done Done 1st draft in report 08/08/11 Done approved by denise 08/05/11
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 1st draft awaiting response
Human footprint Done Done Done Done 1st draft in report 08/06/11 Done approved by denise 08/05/11
AIR AND CLIMATE
Air quality Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Climate Done NA Done Done 1st draft in report 08/07/11 Done approved by denise 08/05/11
WATER
Water quality Done NA TMDL data obtained Done 1st draft in report 08/07/11 Done approved by densie 08/05/11
BIOLOGICAL INTEGRITY
Invasive plants Done Done Done Done 2nd draft in report 04/27/11 Done approved
LANDSCAPES
Fire regime 7/30/11 Done Done Done 1st draft done 10/31/11 1st draft done 10/31/11 awaiting comments
Future fire regime Done NA acquired from T. Westerling Done 2nd draft in report 08/01/11 Done final comments by Marti Witter and Denise on 07/28/11
Habitat connectivity Done NA Done-from CEHC Yes 2nd draft in report 06/24/11 Done approved 7/12/11
Light pollution Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11