Difference between revisions of "NPS Condition Assessments"

From Biogeog
Jump to navigationJump to search
Line 1: Line 1:
 
 
=John Muir=
 
=John Muir=
==Status 09/02/11==
+
==Status 09/12/11==
 
{| class="wikitable", border="1" cellpadding="2"
 
{| class="wikitable", border="1" cellpadding="2"
 
|-
 
|-

Revision as of 09:44, 12 September 2011

John Muir

Status 09/12/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density 8/15/11 NA
Human footprint 7/27/11 Done 1st draft sent 08/30/11 1st draft done awaiting response; need to redo with new region
AIR AND CLIMATE
Air quality No No No scripts in place to run
Climate??? NA Data acquired from A. Flint scripts in place to run
WATER
Water quality 8/15/11 NA rely on Moore watershed report?
BIOLOGICAL INTEGRITY
Old growth oak woodlands/bay laurel??? David??? see vegetation map 2004, landfire
Alameda whipsnake 8/15/11 Done Done Done 1st draft sent 09/09/11 1st draft done awaiting response
Invasive plants??? David Done
LANDSCAPES
Fire regime Frank No No
Climate change-wildfire interaction??? David NA acquired from T. Westerling R scripts in place to run
Habitat connectivity David No Bay Area Open Space No 1st draft sent 08/30/11 1st draft done awaiting response; need to redo with new region
Other endpoints?



Santa Monica Mtns

Status 09/02/11

Stressor/Indicator Due/Done Conceptual Model Data Compiled Analysis Done Report Status Graphic status Feedback from NPS
STRESSORS
Housing density Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Road effects and accessibility Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11
Pesticides Done NA Done Done 1st draft in report 08/08/11 Done approved by denise 08/05/11
Rodenticides Patrick NA Done Done 1st draft sent 5/19/10 1st draft awaiting response
Human footprint Done Done Done Done 1st draft in report 08/06/11 Done approved by denise 08/05/11
AIR AND CLIMATE
Air quality Done NA Done Done 2nd draft in report 07/28/11 Done approved by denise 7/27/11
Climate Done NA Done Done 1st draft in report 08/07/11 Done approved by denise 08/05/11
WATER
Water quality Done NA TMDL data obtained Done 1st draft in report 08/07/11 Done approved by densie 08/05/11
BIOLOGICAL INTEGRITY
Invasive plants Done Done Done Done 2nd draft in report 04/27/11 Done approved
LANDSCAPES
Fire-plant community interactions 7/30/11 In progress Done In progress to be done have not seen conceptual model yet
Future fire regime Done NA acquired from T. Westerling Done 2nd draft in report 08/01/11 Done final comments by Marti Witter and Denise on 07/28/11
Habitat connectivity Done NA Done-from CEHC Yes 2nd draft in report 06/24/11 Done approved 7/12/11
Light pollution Done NA Done Done 2nd draft in report 05/02/11 Done approved by denise, 5/2/11